Federal, state and local government agencies must continuously stretch tax dollars as far as possible, often times balancing construction funding across projects for all types of facilities.

In an environment where citizens demand tight budget and schedule controls, MOCA Systems provides government agencies with an unparalleled service for controlling complex capital projects.  MOCA Systems has a proven track record in assisting government agencies with capital project controls of several projects with multiple design and construction teams.  

With MOCABuild™, MOCA Systems provides a verifiable cost and schedule that is used throughout the project from conceptual design through construction completion, which provides an audit trail that meets these accountability requirements.   There is no other company that has a verifiable database of actual construction activities and a simulation engine to forecast potential cost and schedule implications on multiple scenarios while maintaining a record of progress to date.

Many government agencies are responsible for the construction of similar facilities in different regions, sometimes across different organizations within the agencies’ responsibility.  In addition, there is often repetition of facility design and construction across these distributed organizations.  Many agencies are capitalizing on this to greatly improve productivity.

 
Agencies are developing more standardized performance reports for monitoring project performance based on actual construction progress.  MOCA Systems develops a detailed cost and schedule estimate for each project at the conceptual design phase, and then updates the estimates based on design and construction progress.  Because the MOCABuild™ baseline estimates are based on actual, detailed project performance, MOCA has the real project information to roll-up into multi-project summary reports.  This enables executives with timely and accurate project status, and project managers have the detailed project information to more proactively analyze the situation and fix before an event becomes a crisis.

Because many government capital projects are built in high security areas, there is often a need to sequence work activities and manage multiple trades in a confined space.  MOCA has the expertise and MOCABuild system to evaluate and predict the cost and schedule impacts of different means and methods including workzones and sequencing.  The result is the ability to select the optimal design and construction option that minimizes disruptions to operations with the minimal demands on operating staffs.